ABSTRACT
The 200W solar system was determined by load assessment, solar panel number determination, battery requirement and then inverter sizing. A complete solar panel rated at 200w was however purchased, together with 2 no. 150A solar battery, 1500W inverter and also 10A charge controller. These were assembled together with necessary protective gadgets like cut out switches; to give the 200W expected. The solar panel was mounted outside the building to allow for maximum collection of sun energy. It is expected that the system will help the department meet up with its office duties even when central power is not available.
Background of the Study
Online collaborative projects have emerged as a key instructional strategy in digital education, f...
Chapter One: Introduction
1.1 Background of the Study
Religious extremism poses a significant threat to societal stability, pea...
Background of the Study
Whistleblowing, the act of reporting unethical practices, fraud, or corruption within organizati...
Background of the Study:
Health insurance is a critical mechanism for reducing the financial burden of healthcare and impro...
ABSTRACT
This topic the effect of sales promotion as a tool for achieving customers brand loyalty in th...
Chapter One: Introduction
1.1 Background of the Study
Education is a cornerstone of national development, and public policies p...
Background of the Study:
Parental stress is a critical factor that influences the overall effectiveness of early childhood...
Background of the study:
University transport systems play a vital role in ensuring the smooth operation of academic instit...
Background of the Study
Nigeria’s economic growth has historically been driven by a narrow range of sectors, predomin...
Background of the study
Time management is widely recognized as a fundamental skill that influences academic achievement, p...